Projects
Projects Undertaken
Tyco Electronics Corporation.
- LT ABC Installation Approx length 2000 Km.
- Ampact Wedge Type Connecter Installation in 400 KV grid & below & installation on transmission conductor.
- Erection & Commissioning of 11 KV distribution system for pumping station at Libya.
- Laying of cable for fire fighting.
- Installation of control instruments for fire fighting.
- Making of Plinth for Installation of DG.
- Installation of 625 KVA DG.
- Supply & installation of exhaust pipe along with insulation.
- Supply & laying of power & control cable.
- Making of earthing pit & laying of earth strips.
- Installation of control instruments for fire fighting.
- Operation & Maintenance of 33 KV/11KV grid.
- Operation & maintenance of 33 KV & 11 KV lines.
- Maintenance of 11 KV/440 V distribution transformers.
- Maintenance of 440 V Overhead lines.
- Attending to all kind of electrical complaints by consumer.
- Energy Auditing of distribution system.
- Replacement of faulty meters.
- Replacement of meters under mass meter replacement.
- Operation & maintenance of 1 MW Roof Top solar plant at Delhi. (Since 2010- till date)
- Operation & maintenance of 5.75 MW solar plant at Naini. (Since 2011 till Date).
- Operation & maintenance of 5 MW solar plant at Neemarana. (2012-2015)
- Operation & maintenance of 250 MW solar plant at Aayna, Anantpur. (2020- 2022 )
- Operation & maintenance of 250 MW solar plant at Net Magic, Solapur. (2020- 2022).
- Installation of Electrical Equipments at 65 MW Bhadla, Bap, Rajasthan.(2012-2013).
- Operation & maintenance of 100 MW solar plant at NTPC, Anantpur
- Operation & Maintenance of 33 KV Switch Yard (24 x 7 Basis).
- Operation & Maintenance of 26 nos 4 MVA 380V/33 KV step-up Transformers.
- 16500 nos Module Cleaning on cyclic basis.
- Grass Cutting of 600 Acres of Land.
- Operation & maintenance of 67.5 MW solar plant at Beed, Maharastra.
- Operation & Maintenance of 11/132 KV Switch Yard (24 x 7 Basis).
- Operation & Maintenance of 10 nos 5.5 MVA 380V/11 KV step-up Transformers and 1 no 55 MVA, 11KV/132 KV Transformer.
- 13500 nos Module Cleaning on cyclic basis.
- Grass Cutting of 550 Acres of Land.
- Operation & Maintenance of 22 KV switching station.
- Operation & maintenance of 22 KV & 440 V underground lines.
- Maintenance of 22 KV/440 V distribution transformers.
- Maintenance of 440 V switchgear panel.
- Attending to all cable fault.
- Attending to all kind of electrical complaints.
- Operation & Maintenance of 22 KV switching station.
- Operation & maintenance of 22 KV & 440 V underground lines.
- Maintenance of 22 KV/440 V distribution transformers.
- Maintenance of 440 V switchgear panel.
- Attending to all cable fault HT & LT.
- Attending to all kind of electrical complaints.
- Operation & maintenance of 15 MW solar plant at Bahera, Gaya.
- Operation & maintenance of 25 MW solar plant at Sawalaka, Gaya.
- Operation & Maintenance of 132 KV Switch Yard (24 x 7 Basis).
- Operation & maintenance of 11 KV and LT Switchgear (24 x 7 Basis).
- Maintenance of 132 KV / 11 KV/440 V distribution system.
- Operation & maintenance of 130 MW solar plant at NTPC, Anantpur
- Operation & Maintenance of 132 KV Switch Yard (24 x 7 Basis).
- Operation & Maintenance of 2 nos 55 MVA 3/132 KV step-up Transformers.
- Operation & Maintenance of 12 nos 12.5 MVA 380V/33 KV step-up Transformers.
- 16500 nos Module Cleaning on cyclic basis.
- Grass Cutting of 1200 Acres of Land.
Our Clients